eGate ePredict™ was developed together with leading construction experts to answer one question: how many days it takes for the concrete slab to dry? With real-time drying forecasting, you can see if the drying time will fit inside your flooring project schedule. And if not – you can try to optimize the ambient environment, to expedite the drying process, or use epoxy coatings to conceal the moisture.
To see how it works – download the ePredict™ datasheet by entering your email here:
